?
Every layer of the envelope, engineered and installed to work together as a single water-management system.
Fiber-cement, wood lap, panel, and shingle systems — installed with proper clearance, fastener pattern, and termination details for PNW weather.
Vinyl, aluminum, and wood windows flashed at sill, jambs, and head; integrated with the WRB and sealed at the rough opening.
House wraps, self-adhered membranes, and fluid-applied WRBs — lapped shingle-style for positive drainage to grade.
Shop- and field-bent head flashings, drip edges, kick-outs, sill pans, and decorative trim profiles.
Backer-rod with polyurethane or silicone at every joint, control joint, and dissimilar-material transition.
Metal and fiber-cement panel assemblies with engineered ventilated drainage planes behind the cladding.
Continuous exterior rigid-board insulation taped and detailed to maintain thermal continuity and the drainage plane.
HM door and frame installation with proper flashing integration — code-compliant openings for commercial and multifamily.
CMU and brick veneer coordinated with the envelope — flashed, weep-vented, and tied back per code and structural drawings.
Six clear steps. Transparent communication throughout.
We review your plans, specs, and site conditions, and discuss timeline and scope.
Transparent line-item pricing with defined scope, inclusions, exclusions, and schedule.
Material submittals, mockups when required, and coordination with the GC and other trades.
Skilled crews, daily quality checks, and proactive communication throughout the install.
Third-party and AHJ inspections coordinated and supported with documentation.
Punch-list resolution, warranty documentation, and a final walkthrough.